This Junior High School is part of
an historic neighborhood and had experienced a roof fire in an HVAC
unit. The challenge of the project was
to repair the fire damaged structure while enabling the school to stay
in session and hold classes for over 400 students.
CSDI replaced the HVAC unit, replaced the roof and roof structure,
replaced the gymnasium floor, repaired the structural fire damage
to the exterior
walls, and successfully blended the new construction with the existing
building.
|